PAYBACK PERIOD CALCULATION OF AGNKS

Consolidated calculation

Output price of 1м3 of natural gas at AGNKS
VAT excluded
calculate!
Input price of 1м3 of natural gas
VAT excluded
Indicators AGNKS-75 АGNKS-140 АGNKS-М200 АGNKS-400
Productivity of the station, normal М3 per hour 420 485 650 1200
Station load ratio 0.8 0.8 0.8 0.8
Capital costs Sum, hryvnas Sum, hryvnas Sum, hryvnas Sum, hryvnas
Basic cost of equipment
Design work
Erection work
Land plate
Costs of connection to engineer network
Station AGNKS productivity, normal м3 for 24 hours, load ratio being 80% - - - -
Revenue from selling the compressed gas at the price, p.a., hryvnas - - - -
Gross profit, p.a., hryvnas - - - -
Net profit - - - -
Net cash flow (net profit + amortization) - - - -
Payback period, month - - - -

Сompleteness of the AGNKS block suite:
- Compressor block,
- block of accumulators,
- block of inlet cocks,
- dispenser,
- refuel ramp,
- control system, system of inter-block gas pipelines,
- spare parts.
HOME
ABOUT THE COMPANY
PRODUCTS
Product catalogue
Service works
Payback period
Questionnaire
QUALITY CERTIFICATES
AGNKSs INSTALLED
FAQ
TENDERS
VACANCIES
SITE MAP
CONTACT
 
Your basket is empty
 

Subsribe for news

Email address:
Subscribe Unsubscribe





AGNKS in the town of Novograd-Volynsky
AGNKS-75 (2 pages)
AGNKS in the town of Korosten'
AGNKS-75
AGNKS in the city of Uzhgorod
AGNKS-200
bigmir)net TOP 100 Каталог сайтов города Сумы


Ukraine, 40030 Sumy,
Independence Square, 15
Telephone
: +38 /0542/ 60-78-55
+38 (050) 776-02-90
Fax: +38 /0542/ 60-78-54

E-mail: market@gazmash.sumy.ua
Warning: in_array() expects parameter 2 to be array, null given in /home/sumygazm/sumygazmash.com/www/f111b54a4583110562c8f1c8f6830a46/sape.php on line 193
Русская версия сайта Українська версія сайту English version